• +90 212 777 60 60
  • info@bmsyapias.com
PE-To Metal Transition Piece(Transition)
You are here: Home \ Products \ Installation \ Fittings \ PE-To Metal Transition Piece(Transition)
PE-To Metal Transition Piece(Transition)

PE-To Metal Transition Piece (Transition) 
Material : HDPE(PE 100)Standart: TS 418-3  EN 12201-3
Prod. Range : SDR 17 (PN 10) & SDR 11 (PN 16) 

 Z
L1
L2
 
          Size   (d-R)          
      Pressure (Bar)   
              Code No             
    (mm)   
   (mm)   
           
   Net Weight (Kg) 
(mm)     (Inch)
 
 125        4”
PN 16
2 06 01 16 0125 000
505
195
160
6,250
160        6”
PN 16
2 06 01 16 0160 000
440
190
170
12,640
180        6”
PN 16
2 06 01 16 0180 000
440
260
 
 
200       8”
PN 16
2 06 01 16 0200 000
650
320
250
23,600
225        8”
PN 16
2 06 01 16 0225 000
630
260
250
26,200
250       10”
PN 16
2 06 01 16 0250 000
570
260
240
37,300
280       10”
PN 16
2 06 01 16 0280 000
570
260
250
48,200
315        12”
PN 16
2 06 01 16 0315 000
570
260
250
50,900
355        14”
PN 16
2 06 01 16 0355 000
780
380
250
107,66
400        16”
PN 16
2 06 01 16 0400 000
**
**
**
**
450        18”
PN 16
2 06 01 16 0450 000
**
**
**
**
500        20”
PN 16
2 06 01 16 0500 000
**
**
**
**

- See more at: http://turanmak.com/en/products/pe-celik-gecis-k-agizli/#sthash.CtGmHOaw.dpuf